LBNL IceCube Personnel

circa 2006

Group Photo

Email Addresses

Name Photo
Phone
Office / Mail Stop
Activity  

Keith Beattie

Computer Scientist

510 486-6297

50B-2258G

50B2239

  DAQ software integration, testing, release engineering and
configuration management.
 

Brad Bingham

Engineer

510 486-5049

46-0220

46R0125

  DAQ Hub hardware development,
manufacture and testing
 

William Chinowsky

Physicist

510 486-6989

50B-6204

50R5008

  Collaboration governance, education outreach.  

Dmitry Chirkin

Physicist

510 486-4094

50-6003

50R5008

  Time/waveform calibration and feature extraction. Muon and cascade reconstruction, detector performance verification.  

Chris Day

Software Engineer

510 486-5736

50B-3238E

50B3238

  Experiment control  

Azriel Goldschmidt

Physicist

510 486-7518

50-5041A

50R5008

  DOM MB development, production, and testing. Icecube run coordinator in charge of detector operation at south pole.  

Michael Harris

Research Assistant

510 495-2348

50A-6105

50R5008

  Perform integration testing and monitoring data quality.  

John Joseph

Electronics Engineer

510 486-4382

50A-6145B

50A6134

  Coordination of DOM Main Board production. Co-L3 manager of DAQ hardware.  
Joanna Kiryluk 510 486-6362

50-5039A

50R5008

     

Spencer Klein

Physicist

510 486-5470

50-5041B

50R5008

  Hardware-related software, DOM simulations, and e- /neutrino cascade
reconstruction.
 

Howard Matis

Physicist

510 486-5031

70-0308

70R0139

  Design test infrastructure and equipment.  

Charles McParland

Lead Software Engineer

510 486-6956

50A-3136C

50A3111

  L3 manager for DAQ Software  

David Nygren

Physicist

510 486-7162

50B-6204A

50R5008

  L3 manager for DAQ Hardware  

Simon Patton

Software Architect

510 486-6883

50B-3238E

50B3238

  Software management  

Gerald Przybylski

Electronics Engineer

510 486-7165

50-5037A

50B6222

  Engineer on Digital Optical Module Maiboard and master clock
distribution subsystem.
 

Cecile Roucelle

Physicist

510 486-6967

50-5039

50R5008

  In charge of simulation and calbration software for the DOM. Muon neutrino point sources searches with IceCube  

Thorsten Stezelberger

Electronics Engineer

510 495-2489

50A-6141A

50R5008

  Designing and fixing DOM hardware and fpga code.  

Robert Stokstad

LBNL Project Director

510 486-4451

50-5008

50R5008

  Institutional lead, performance verification, RapCal time calibration.